
Eyecare Office
New branch circuitry, devices, lighting, and fire alarm installation throughout the office.
A full-floor electrical buildout delivered new power distribution, lighting, and life safety systems within a 6,000-square-foot office space. Work included complete demolition and code-compliant installation aligned with City of Pittsburgh requirements.
- Demolished existing electrical systems and made all circuits safe
- Installed complete power distribution throughout the 18th floor space
- Furnished and installed all electrical devices and receptacles
- Installed lighting systems with integrated lighting controls
- Installed and integrated fire alarm system for code compliance
- Completed all work in accordance with City of Pittsburgh requirements
- Kitchen area showing lighting, power, and fire alarm installation.
- Hallway view highlighting installed lighting and power distribution.



