A complete electrical installation supported new construction of a 15,000 square-foot office and warehouse facility, including service, distribution, lighting, and site infrastructure.
- Installed 800-amp, 480/277V, 3-phase electrical service
- Completed under-slab electrical rough-in for office and warehouse spaces
- Furnished and installed power distribution, devices, and lighting systems
- Installed and integrated fire alarm system for code compliance
- Installed site lighting, including pole bases
- Performed excavation and underground electrical work for site and building infrastructure
- Complete electrical installation for new 15,000 SF steel building, including a 2,000 SF. office and 13,000 SF warehouse/shop.
- Office rough-in and final installation for lighting, power and fire alarm systems.
- 800A, 480V MDP with 75 kVA 480–208V transformer and 400A, 120/208V panelboard.
- 800A CT cabinet installation with 4″ PVC conduit.






