Complex utility coordination and underground rework enabled installation of new primary feed and transformer infrastructure for a growing facility.
- Coordinated with owner and utility provider to redesign primary feed configuration
- Reworked existing high-voltage junction box to accommodate expanded service
- Installed new junction box and conduit system for primary and secondary feeds
- Performed excavation around active utilities with careful routing and protection
- Installed conduit pathways and stub-ups for utility company connections
- Installation of new 5″ conduit between high-voltage junction boxes.
- Conduit stub-ups installed for primary and secondary utility connections.
- Existing site conditions supporting transformer, junction box, and utility pedestal infrastructure prior to reconfiguration.