A targeted electrical installation provided dedicated high-voltage power to support new industrial equipment. Work included conduit routing, disconnect installation, and complete system termination.
- Installed 1-1/4″ EMT conduit from main distribution panel to new disconnect
- Furnished and installed 480V, 100-amp disconnect for equipment
- Routed and supported conduit in accordance with code requirements
- Completed installation and terminations to support equipment connection
- Line and load conduits connected to the disconnect switch.
- 1¼” conduit routed from the 480V MDP.




